ADDING FOCUS
This exercise imagines continuity in a less literal way. It doesn’t seek a continuous longitudinal ordination but an intense intervention at specific spots. High-speed connections are open at a wide territory at the same time that organizes it with new facilities. Detects the importance of a missing junction between B-23 and the old road that linked Barcelona with Madrid and articulates a wider order between the two Avenue sides by reinforcing its traces imagining new uses and volumes.
Comment on the project by Marta Jo and Glòria Serra